Used to accommodate the blowdown water from the boiler(s).
Designed to ASME VIII DIV 1 2015 and manufactured in compliance with Pressure Equipment Safety Regulations 2016.
Supplied with full manufacturing data dossier.
Strictly compliant with CEA Guidance Note BG03.
document | language | reference number | download |
---|---|---|---|
ABV21i and ABV40i Air Actuated Boiler Blowdown Valves | English | TI-P405-45 | Download PDF |
BDV60 Blowdown Vessels | English | TI-P405-33 | Download PDF |
KBV21i and KBV40i Key Operated Boiler Blowdown Valves | English | TI-P405-47 | Download PDF |
document | language | reference number | download |
---|---|---|---|
ABV21i and ABV40i Air Actuated Boiler Blowdown Valves | English | IM-P405-46 | Download PDF |
BDV60 Blowdown Vessel | English | IM-P405-31 | Download PDF |
BT1050 Boiler Blowdown Timer | English | IM-P405-39 | Download PDF |
KBV21i and KBV40i Key Operated Boiler Blowdown Valves | English | IM-P405-48 | Download PDF |