Used to accommodate the blowdown water from the boiler(s).
Designed, built and inspected to PD 5500.
Supplied with full manufacturing data dossier.
Strictly compliant with UK Health and Safety Executive Guidance Note PM60.
document | language | reference number | download |
---|---|---|---|
ABV21i and ABV40i Air Actuated Boiler Blowdown Valves | English | TI-P405-45 | Download PDF |
BDV60 Blowdown Vessels | English | TI-P405-33 | Download PDF |
KBV21i and KBV40i Key Operated Boiler Blowdown Valves | English | TI-P405-47 | Download PDF |
document | language | reference number | download |
---|---|---|---|
ABV21i and ABV40i Air Actuated Boiler Blowdown Valves | English | IM-P405-46 | Download PDF |
BDV60 Blowdown Vessel | English | IM-P405-31 | Download PDF |
BT1050 Boiler Blowdown Timer | English | IM-P405-39 | Download PDF |
KBV21i and KBV40i Key Operated Boiler Blowdown Valves | English | IM-P405-48 | Download PDF |